Listing

The construction of the tunnels beneath Lords Cricket Ground.

Much to the annoyance of W. G. Grace and his fellow cricketers, the Manchester, Sheffield & Lincolnshire Railway opted to build their new railway directly beneath Lords Cricket Ground in St. Johns Wood. Eventually the cricketers conceded as they were promised a brand new pitch, and this photograph shows the construction work in progress. The tunnels were built by the 'Cut & Cover' method, rather than boring, and this is shown to good effect here. The wooden centrings are in place and the brick courses are being built up. The scale of the work can be judged by the group of navvies gathered in the bottom right of the picture. When finished, the area would be covered over and the new cricket pitch laid. The work was carried out by J. T. Firbank of London Bridge between 1894 and 1898. See on Route Map

Digital Reference: L1341
Creator: Newton, S. W. A. - circa 1896
Contributor: Leicestershire County Council
Type: Black & White
Format: 118mm, 161mm
Copyright: Leicestershire County Council
Source: S. W. A. Newton Collection - Record Office for Leicestershire, Leicester & Rutland (part of S. W. A. Newton Collection, copy of glass plate negative)
Identifier: Newton - E 3/6
OS Reference: 526800 182800