GCR sidings at Gotham, Nottinghamshire
'Plaster works, Gotham, GCR sidings' 5th May 1900 (S. W. A. Newton's notes). Built between 1899 to 1900, the Gotham branch was a later addition to the London Extension, connecting the main line with sidings at this industrial site in Nottinghamshire.